Notes connector production
1. The cut line: check the wire specification model is correct; size to meet the requirements; incision must flush, do not scratch the wire, wire spotless and so on.
2. peel the skin: check whether the flush stripping mouth, do not hurt the wire stripping, wire and other grouping, stripping dimensions are correct.
3. Group treatment: trim size is correct, whether flush trimming, pruning marshalling can not hurt to the core wire.
4. Stripping Endothelial: Check whether the flush mouth peeling; peeling size is correct; whether the injury stripping wire, broken wire; semi-stripping when the insulator can not fall off.
5. sleeve shrink tube: Check the shrink tube size, type is correct.
6. preliminary solder: Check furnace temperature is correct; if the wire before the preliminary solder wire collated, whether there is bifurcation, bending, discounts and other phenomena; whether there is bifurcation after preliminary solder wire, bulk, copper missing insulation and scald skin and so on.
7. Solder: Check whether the correct temperature soldering iron; can not burn insulation, tin point should be smooth, Wuxi sharp, can not false welding, Weld.
8. Crimping: Check the terminals, wire specification is correct; Crimping Have flare, tilt, and wire insulation is exposed is too long or too short.
9. terminal insertion: Check connectors, terminal type is correct; terminals without injury, deformation phenomena; terminals a seamless plug, wrong plug, the insertion is not in place and so on.
10. Cable Crimp: Check the connector type is correct; row line direction is correct; the wires are damaged, exposed copper, scald; crimping is in place.
11. Blow shrink tube: shrink tube shrink is good, do not burn insulation.
12. The assembly of the housing: Housing if installed wrong, with or without scratches, burrs and other undesirable, a seamless installation parts, screws tighten or without hair, oxidation, discoloration, loose bad, no bad fit after assembly; if there is a direction of the housing and then it must be in accordance with the requirements of the assembly.
13. Labelling: Examine the contents of the label is correct, clear, no hyphenation phenomenon; the size of the label is correct; the label is dirty, damaged; label affixed position is correct. 14. The fight Ties: Check tie the size, color, position is correct; no fracture, loosening.
15. Injection molding: Check whether there is mold dirty, whether forming part of a bad lack of material, bubbles, bonding, bad sclerosis.
16 plug molding: Check the plug molding without damage, uneven, lack of material, burrs, debris, and other adverse rhyolite, confirm the metal terminal without deformation, damage, exposed copper is bad.
17. Electrical Inspection: inspect and guide the votes in accordance with the requirements of the corresponding product inspection.
18. visual inspection: Pay attention to all the items as long as they can be seen to be checked. For example: check the product size to meet the requirements; if the wrong material, with or without multi-use or little use; check cable, connector surface for scratches, stains, burrs, deformation, gap and other bad; connector mount whether missing equipment, housing assembly agreement is good; the contents of the label is correct, clear; label position, direction is correct; if crimping state is good, a seamless plug, wrong plug, the insertion is in place; cable crimp in good condition; shrink vasoconstriction is good, the retracted position, the size is correct; tie specifications, quantity, location is correct, whether the swap,